To compare renovation quotes, don’t compare the totals: compare them line by line. Check that each company measures the same thing, in the same units, with the same materials included, and that they all set out VAT, payment terms, timeline, guarantee and rubble removal. A cheaper quote that leaves out waste management or materials isn’t cheaper, it’s a different job.

Before asking for quotes: the same job for everyone

The comparison begins before the offers arrive. If you tell one company “redo the bathroom” and show another a list of what you want, they won’t be pricing the same thing. Prepare a shared description:

  • Which rooms are being renovated and what is being kept, such as hydraulic tiles, doors or cornices.
  • Layout changes, with a sketch, even a hand-drawn one.
  • Which materials you choose and which you leave to the company, with an indicative range.
  • Installations: whether they are renewed entirely or just adapted.
  • Preferred dates and whether you will live in the flat during the work.

How to read a quote line by line

Each line item (partida) should have four elements: a description, a unit, a measurement and a price. If any is missing, ask. This is what to check in each one:

  • Description. “Bathroom tiling” says nothing; “tiling of bathroom walls with ceramic tiles up to the ceiling, including adhesive and grout” does. The more specific, the fewer arguments later.
  • Unit. Demolition and tiling are measured in m², skirting in linear metres, sanitaryware in units and rubble by volume. If two companies use different units for the same thing, convert them before comparing.
  • Measurement. Check that the square metres match your flat. A very round figure, or one very different from another company’s, means someone hasn’t measured.
  • Materials included or excluded. It should say whether the price includes the material and in which range, or whether it is labour only. Items “to be chosen by the client” should carry a reference amount.
  • Unit price and line total, so you can recalculate if the measurement changes.

Reference prices to check line items against

To see whether an item is within a reasonable range, our starting prices in Barcelona can serve as a reference:

Line itemUsual unitGuide price
Removing a partition wallm² of wall€15–35/m²*
Lifting floor or wall tilesm²€10–25/m²*
Full interior demolitionm² of flat€40–70/m²*
Rubble removalvolume or bulk bagspriced by volume*
Electrical installation renewalm² of flatfrom €45/m²*
Bathroom plumbing renewalunitfrom €900*
Painting walls and ceilings, two coatsm² paintedfrom €8/m²*
Full renovation, labour onlym² of flatfrom €300/m²*

*Guide labour prices. The final amount depends on the condition of each flat and is confirmed in writing after the visit.

What sits outside the line items and still counts

  • VAT. The quote should say whether prices include it and which rate applies. When renovating a private individual’s home it can be 10 % if the requirements are met, including that materials supplied by the contractor don’t exceed 40 % of the taxable base; otherwise 21 %. You will normally sign a declaration. Be wary of offers “without VAT” or “without an invoice”.
  • Payment terms. A sensible arrangement is an initial payment, the rest as stages are completed, and a final amount on handover. All in writing.
  • Timeline. Planned start date, duration in weeks and what happens if materials you choose are delayed.
  • Guarantee. It should state in writing what it covers and for how long. At KONSTRUKT, labour carries a 2-year guarantee.
  • Waste management. Rubble removal, bulk bags or skip, authorisation to occupy the public highway and delivery to an authorised waste manager, which the Ajuntament may ask you to prove.
  • Permits. Who files the works notification or licence application, and whether the fee and the ICIO construction tax are included or paid by you.
  • Unforeseen work. How new items found once walls are opened are priced: the right approach is to stop, show you and quote it in writing before carrying on.
  • Validity of the offer, because material prices change.

Red flags

  • A single overall price, with no line items or measurements.
  • Lump sums for the important parts, such as “complete plumbing” or “electrics”, without saying what they include.
  • A total far below the others with no clear explanation: something is usually missing.
  • No mention of rubble, permits or protection of the staircase.
  • Most of the payment upfront.
  • Nothing in writing about guarantee, timelines or materials.
  • Pressure to sign or a discount that expires the same day.
  • No visit to the flat before pricing a large job, especially in an older building in the Eixample or Gràcia, where the real state of beams and pipes changes the quote.

How to put quotes side by side

Make a sheet with one row per line item and one column per company. Where one company includes something another doesn’t, note the gap and ask. In the end you will have three comparable totals and a list of specific questions, which is what genuinely helps you decide. If one item is far above or below the others, ask them to explain the measurement and material: the difference is often there rather than in the price per m².

If you want a quote that can be compared with any other, send us photos and what you want to do. We reply within 24 working hours, come to measure and send you a written quote, item by item, with measurements, materials, VAT, payment terms, timeline and guarantee. We work across Barcelona, the metropolitan area and the province, from L’Hospitalet and Cornellà to Badalona and Sant Cugat.

Frequently asked questions

Questions on this topic

The company’s and client’s details, the site address, the list of line items with description, unit, measurement and price, which materials are included, the VAT applied, payment terms, the completion time, the guarantee, waste management and permits, and how long the offer is valid.

Two or three detailed quotes based on the same description of the work are usually enough to compare. More than the number, what matters is that every company is quoting for the same thing.

Yes, an initial payment with the rest paid as stages are completed is common. What isn’t a good sign is being asked for most of the amount before work starts. The payment terms should be written into the quote.

It is an item with an overall price and no detailed measurement (partida alzada). It is acceptable for small, well-defined jobs, but if the major items are lump sums you can’t check what they include or compare them with another offer.

It should state clearly whether prices include it and which rate applies. When renovating a private individual’s home it can be 10 % if the legal requirements are met, otherwise 21 %; confirm with your gestor (tax adviser) or the Agència Tributària.